A few days ago, China Construction Eighth Engineering Bureau
Zhengzhou Grand Theater project passed the completion and joint acceptance
Unique architectural image with Chinese heritage
Standing on the Central Plains
Sailing Shadow on the Yellow River, Boat of Art
Zhengzhou Grand Theater Project
The total construction area is about 128,000 square meters
Including song and dance theater, opera hall, concert hall
Multifunctional hall, related supporting facilities, etc.
It is the highest-level theater in China
The highest hall of performing arts in the Central Plains
(Click on the video link to take you through the engineering style)
The project is designed and constructed according to international standards
The overall design concept is
"Yellow River Sail Shadow, Art Boat"
Deduced an ancient ship sailing on
The effect of sailing and breaking waves on the Yellow River
Will further help Zhengzhou City
文化艺术事业可持续发展
Three major theaters, playing nine beautiful chapters
Zhengzhou Grand Theater is a super large theater
Both professionalism and practicality
Can meet the needs of various song and dance performances
Full of artistic appeal
Song and dance theater
Xu Youren
Used in "Shuilongyin·Crossing the Yellow River"
"The turbid waves lean eastward"
To describe the turbulent scene of the Yellow River
The song and dance theater used this as a creative prototype
Looking up, it looks like
The Yellow River is pouring down
Concert hall
The concert hall design is inspired by
Famous in the world and a specialty of Henan Province
One of the five famous porcelains in ancient times, Jun porcelain
Natural and elegant appearance
The artistic characteristics of Jun porcelain "one color in the kiln, colorful out of the kiln" are vividly expressed
Xiqu Hall
Veil-like top design
Chinese red silk-like wall
The design of the opera hall inherits the Henan opera culture
A strong sense of history, with great ancient rhythm
Craftsmanship, first-class quality
Zhengzhou Grand Theater
Like seven sails facing the wind, splitting the waves and cutting the waves
Behind the visual shock is the complex facade structure
It is also the primary difficulty faced by the construction team
The facade of the Grand Theater is enclosed by a tapered surface
Complicated structure, many special-shaped structures
High precision requirements for material processing and on-site installation
To ensure component quality and hoisting accuracy
The project team uses BIM comprehensively
3D scanning, measuring robots and other technologies
Deepen the design with professional software
Realize precise positioning installation
Technology leads, go all out
The project team completed the facade construction with high standards
And won the China Steel Structure Gold Award
Achievements of BIM Competition of China Construction Industry Association
Series of honors
On-site inspection and evaluation by many experts in the industry
It was agreed that the project construction reached
"Domestic leading, world-class" level
The lingering sound, the sound is on the scene
Acoustic effect is the core of the Grand Theater
The unity of decoration effect and acoustic function
Directly determine the presentation effect of art
And the audience's intuitive feelings
To ensure professional performance
The project team uses 3D laser scanning
Comprehensive scanning of architectural decoration space
High-precision simulation and analysis of acoustic effects
Selected by many experiments
Finally applied a customized
Curved reflective acoustic panel
Effectively avoid excessive low frequency sound absorption
Make sure the sound is even
Diffuse reflection to various locations in the theater
The organ of the Grand Theater Concert Hall is
By the oldest manufacturer in existence
"Tailor-made" for it
92 stops, 4886 sound tubes
Can achieve high, medium and bass balance
Fully satisfy the artist's artistic imagination
Let culture and art
Converge in the architectural space
China Construction Eighth Engineering Bureau adds a grand theater to Zhengzhou
Playing the Chinese Movement of the Central Plains