Beijing Oriental Stage Technologies Co., Ltd.
CN|EN

News Bulletin

"War" on the stage of the National University of Technology and resumption of work-prevention and control of the epidemic, stable production

Release Date: 2020-06-04 00:00:00Clicks: 968Announcer:

During the epidemic

Almost all offline performing arts activities have stalled

It is undoubtedly fatal to the entire cultural travel industry

However, the epidemic has brought crisis, and the crisis has bred new changes.

Many companies actively adjust to self-help and practice hard work 

The industry has gathered for warmth, the government has rescued the market and other measures

No winter will not pass,

No spring will not come

We wait for the tourism industry to blossom again

 

Under the epidemic, what are the new thinking of performing arts equipment companies, experts, and practitioners? Since the beginning of March, "Performing Arts Technology" has successively published the thoughts on the transformation and development of the current performing arts industry by the big names in the industry and well-known companies in performing arts equipment. You are also welcome to contribute your ideas to share your thoughts.

 

The interviewed company in this issue is a well-known performing arts equipment company-Gansu Gongda Stage Technology Engineering Co., Ltd.

 

Since the outbreak of the new coronavirus-infected pneumonia, the "Technology University Arena" has actively participated in the battle against the "epidemic". On the one hand, it has done a solid job in the prevention and control of the epidemic of the company to ensure the health of employees, and on the other hand, it has organized production and operation work reasonably. , To ensure the stable operation of the production and operation of the enterprise in the extraordinary period.

 

On February 10, the "Technical University Stage" ushered in the first day of formal resumption of work after the extended holiday for the new crown pneumonia epidemic. In order to continue to strengthen the prevention and control of the epidemic and ensure the health and life safety of employees and their families, the company actively responded to the call of superiors. "Keep your own door and be optimistic about your own people". After resumption of work, the management of personnel entry and exit, the disinfection and protection of public places such as office and production areas, and the management of employees' meals are implemented one by one to ensure that prevention and control work does not leave loopholes or dead ends. Ensure the safety of employees and ensure safe operation!

 

 

Disinfection of production workshop

The situation of pneumonia caused by the novel coronavirus infection in the production workshop is severe, endangering people's lives and health. Under this severe situation, the production and operation of Gongda Stage Company will inevitably be affected.

 

One is the shortage of human resources after the resumption of work and production, and under-starting. The resumption of work and production on the "Technical University Stage" originally scheduled for February 5th had to be postponed to February 10th. At the same time, due to the needs of epidemic prevention and control, many non-local employees were unable to return to Lanzhou in time. The requirement to self-quarantine for 14 days has greatly reduced the number of people who actually returned to work on February 10. In this case, the design, production, and installation tasks that should have been completed on schedule are facing serious time constraints and shortage of manpower.

 

Second, the signed projects and the projects under construction are facing delays in completion and delivery. Due to insufficient human resources, shortage of protective materials and increased control measures in various regions, the company's external sales, installation, and after-sales work are basically in a state of stagnation due to the impact of the epidemic. The signed engineering projects cannot be delivered on time, and may even default. The business risks of the company are Operating losses increased sharply.

 

Third, the supply of raw materials and purchased parts has been severely affected. The company's main parts such as motors and reducers originate from Jiangsu and Zhejiang. The resumption of production and production of accessory parts manufacturers is different, and most of them have extended the construction period and caused the production process to be out of touch.   

 

 

Office scene of staff of various departments

In order to do a good job in resuming work and production during the period of epidemic prevention and control, scientific response, precise policy implementation, source control, and a comprehensive fight against epidemic prevention and control.

 

One is to establish a leading group for epidemic prevention and control led by the company’s party secretary and chairman Zhou Houjin and general manager Gao Yaozu. An office is set up under the leading group, and the office is set up in the Comprehensive Management Department to comprehensively promote the implementation of epidemic prevention and control work by the stage company of the Industrial University.

 

The second is to study and formulate the "Emergency Response Plan for the Stage Technology Engineering Co., Ltd. of Gansu University of Technology to respond to the novel coronavirus pneumonia epidemic" and the "Management Measures during the Resumption of Work and Production Epidemic", and timely communicate and implement them through WeChat groups, corporate WeChat and other new media. Employees, when problems are found, effective prevention and control measures are taken in time to prevent and control the occurrence and spread of the pneumonia epidemic caused by the new coronavirus infection. Adhere to source control, focus on "prevention", and dynamic prevention and control. Make full use of new media such as WeChat groups and corporate WeChat to promote and guide epidemic prevention and control, adhere to dual prevention and dual control of epidemic public opinion, and create a strong atmosphere of full participation and joint prevention and control.

 

The third is to regularly disinfect and prevent epidemics in the factory environment, workshops, offices and other public places every day. Implement a zero-reporting system, do a good job in daily temperature testing and reporting of all employees, and each department regularly reports to the emergency office every day on the epidemic situation of the department (whether there is a fever, cough patient or epidemic contact).     

 

 

All workshops resume production

Under the correct leadership of the Party Committee of the "Industrial University Stage" and the unity and cooperation of personnel from various departments, the company has now resumed work and production, and various engineering projects have started one after another. The company's production and operation work has fully returned to normal. Starting from the second quarter, we will pay close attention to projects. Contract orders, fully organized production and on-site installation and construction, and strive to fight a turnaround in production and operation in the second quarter, retake the losses caused to the company due to the impact of the epidemic in the first quarter, and ensure the completion of the annual business objectives and tasks.

(Source: Industrial University Stage)

Next: Sun Ruofeng: Three reform dividends of cultural and tourism integration